Shower remodeling in Charlotte
Tub-to-shower conversions, walk-in showers and tiled showers, built on a waterproofed base.

What we build
A shower gets wetter than any other part of a house, so most of the work is in what you never see: the slope to the drain and the waterproof layer behind the tile. We build showers from that layer out.
- Tub-to-shower conversions
- the tub nobody uses comes out and a shower is built in its place.
- Walk-in showers
- a low curb or none at all, so you step in from the bathroom floor.
- Tiled showers
- walls and floor in the tile you choose, with a bench or a niche where the layout allows.
- Glass
- a fixed panel or a door, fitted once the tile is in.

Sage tile in a vertical stack, a white hex floor and a bench in a walk-in shower. 
A white subway tub surround and a linear marble mosaic floor. 
A honey-oak double vanity with a veined stone top, gold fixtures and a basketweave marble floor.
What makes a shower last
Tile and grout let water through. A shower holds up when a continuous waterproof layer sits behind the tile, turns the corners, meets the drain and slopes toward it. It's the part to ask any installer about before you compare prices. Our guide to waterproofing a tile shower explains the methods.
Tub to shower: what changes
The drain usually moves, and the valve often does too, so a conversion is plumbing work as well as tile. If it's the only tub in the house, decide that first; we talk it through at the visit.
How it runs
Visit
We look at the bathroom, check for water damage, and talk about how you use the shower.
Choices and estimate
You pick tile, glass and fixtures; scope, materials and price go into one written estimate.
Demolition
The old shower or tub comes out, down to the studs where the walls need it.
Plumbing and waterproofing
Drain and valve work, with a permit where the law requires one, then the backer and the waterproof layer.
Tile, glass and walkthrough
Tile and grout, then glass and trim, and we go through the finished shower with you.
How long it takes depends on the shower. Ask us and we'll give you a realistic idea with your estimate.
How much does a shower remodel cost?
Every shower is different, so your price comes from your estimate rather than a list. Ask for yours. For a sense of the market, this is what published cost surveys report. They are market figures, not our prices:
In Charlotte
turning a tub into a custom tiled walk-in shower runs about $4,500 to $17,000. Across all tub-to-shower conversions, prefabricated units included, the average is about $2,900, and most fall between about $1,500 and $7,800.
Nationally
a mid-range shower remodel (ceramic tile, a framed glass door) runs $3,000 to $8,000, and a high-end custom one $8,000 to $15,000. Labour is 40% to 60% of the total.
The showers on this page are tiled, with a waterproof layer behind the tile, so the tiled figures are the closer comparison.
Prefabricated units sit at the low end of those ranges; custom tile, built-in benches and shelves, and higher-end fixtures push a shower toward the high end. The other things that move the price are the size of the shower, taking out and hauling away the old tub, and the glass door.
Sources: Angi, How Much Does Tub-to-Shower Conversion Cost in Charlotte, NC? (updated July 9, 2026: average $2,919, most projects $1,460–$7,784, custom tiled walk-in $4,500–$17,000); HomeGuide, How Much Does a Shower Remodel Cost? (October 6, 2025).
Does a shower remodel need a permit?
Re-tiling a shower where it already is usually needs no building permit in a North Carolina single-family home. Moving a drain or a valve changes the plumbing design, and that needs one. We'll tell you when your project does.
Source (rules as of November 2026): N.C. Gen. Stat. § 160D-1110(c).
Questions homeowners ask
Where we work: Charlotte, Matthews, Mooresville, Concord, Huntersville, Indian Trail, Mint Hill, Kannapolis, Davidson, Cornelius, Fort Mill, Rock Hill.
Tell us about your shower remodeling project
You'll hear back from our team the same business day.